Out Now
The Mental Health Issue
Current Issue
The Mental Health Issue
AUG - SEPT 2025
Navigating the integration of electric vehicle (EV) chargers in apartment buildings requires careful planning and collaboration. Master Electricians’ Ben Brock explores key considerations, from assessing electrical capacity and fire safety to engaging with the body corporate, ensuring a smooth transition to sustainable living.
The rise of EVs is undeniable, and with it comes the growing need for EV charging infrastructure.
For apartment buildings, this transition presents unique challenges factoring existing infrastructure and load capacities. As the NCC 2022 Volume One J9D4 stipulates requirements for new developments, existing buildings face their own set of hurdles.
This guide aims to navigate the complexities and provide practical solutions for implementing EV chargers in apartment buildings.
Assessing supply and demand
Introducing EV chargers into an existing apartment building requires a thorough assessment of the building’s electrical capacity. While one or two chargers might not strain the system, a higher demand necessitates a careful evaluation. AS/NZS 3000 2.2.2 outlines four methods for this assessment:
Solutions for upgrading electrical capacity
To accommodate the additional load from EV chargers, two solutions are available:
1. Upgrading the building’s supply:
This option, while potentially costly, ensures sustainability and reliability. It allows for a full implementation of any size or number of EV Chargers, and it also paves the way for future upgrades, such as solar installations or air conditioning.
2. Centrally managed EV charging systems:
These systems offer features beyond your basic standalone home chargers, providing extra flexibility and efficiency. By monitoring load fluctuations with CT monitors, these systems prevent the installation from exceeding its supply capacity, especially during peak times. Additionally, they often include billing capabilities, simplifying management of the system for the body corporate.
Fire safety considerations
Fire safety is paramount when installing EV chargers in apartment buildings. Even a simple standalone system in a basement poses significant risks. Consulting a fire systems professional ensures appropriate detection and suppression systems are in place.
Key implementations might include:
Engaging with the body corporate
Engagement with the body corporate is crucial. They may have existing procedures or approval processes, particularly for installing standalone chargers. If they already have provisions for centrally managed systems, it’s essential to adhere to these guidelines.
In older installations, allocated parking spots might lack suitable outlets for high loads. Initiating a conversation with the body corporate can lead to an assessment of the electrical installation, enabling the development of a comprehensive plan. This collaboration can result in the most appropriate design and products for the installation.
As the demand for EVs continues to grow, so does the need for robust charging infrastructure. For apartment buildings, this involves careful planning, assessment, and collaboration with various stakeholders.
By addressing supply capacity, exploring viable solutions, prioritising fire safety, and engaging with the body corporate, apartment buildings can successfully integrate EV chargers, paving the way for a sustainable and future-proof living environment.
By navigating these complexities, electricians can carefully guide customers seeking EV solutions in apartment buildings, leading the charge in the EV revolution and ensuring residents are ready for a greener future.
Key takeaways
EV chargers and maximum demand | High loads from EV chargers must be factored into the building’s maximum demand |
Assessment and solutions | Various methods are available to assess supply characteristics, and various solutions exist to cater to EV charging needs, including potential electrical infrastructure upgrades. |
Future-proofing | Upgrading electrical infrastructure benefits other future installations, such as air conditioning. |
Centrally managed systems | These systems, with billing and management capabilities, are ideal for body corporate environments. |
Fire safety | Consult a fire systems professional to ensure appropriate safety measures are in place |
Body corporate engagement | Always consult the body corporate before installing a system, adhering to site policies, or initiating new procedures. |
Keep up to date with our latest news and competitions by subscribing to our regular newsletter.
Issue 183
OCT - NOV 2024
Issue 182
AUG - SEPT 2024
Issue 181
JUN - JUL 2024
Issue 180
APR - MAY 2024
Issue 179
FEB - MARCH 2024
Issue 178
DEC 2023 - JAN 2024
Issue 177
OCT - NOV 2023
Issue 176
AUG - SEPT 2023
Issue 175
JUN - JUL 2023
Issue 174
APR - MAY 2023
Issue 173
FEB - MAR 2023
Issue 172
DEC 2022 - JAN 2023
Issue 171
OCT - NOV 2022
Issue 170
AUG - SEPT 2022
Issue 169
JUN - JUL 2022
Issue 168
APR - MAY 2022
Issue 167
FEB - MAR 2022
Issue 166
DEC 2021 - JAN 2022
Issue 165
OCT - NOV 2021
Issue 164
AUG - SEPT 2021
Issue 163
JUN - JUL 2021
Issue 162
APR - MAY 2021
Issue 161
FEB - MAR 2021
Issue 160
DEC 2020 - JAN 2021
Issue 159
OCT - NOV 2020
Issue 158
AUG - SEPT 2020
Issue 157
JUN - JUL 2022
Issue 156
APR - MAY 2020
Issue 155
FEB - MAR 2020
Issue 154
DEC 2019 - JAN 2020
Issue 153
OCT - NOV 2019
Issue 152
AUG - SEPT 2019
Issue 151
JUN - JUL 2019
Issue 150
APR - MAY 2019
Issue 149
FEB - MAR 2019
Issue 148
DEC 2018 - JAN 2019
Issue 147
OCT - NOV 2018
Issue 146
AUG - SEPT 2018
Issue 145
JUN - JUL 2018
Issue 144
APR - MAY 2018
Issue 143
FEB - MAR 2018
Issue 142
DEC 2016 - JAN 2017
Issue 141
OCT- NOV 2017
Issue 140
AUG - SEPT 2017
Issue 139
JUN - JUL 2017
Issue 138
APR - MAY 2017
Issue 137
FEB - MAR 2017
Issue 136
DEC 2016 - JAN 2017
Issue 135
OCT - NOV 2017
Issue 134
AUG - SEPT 2016
Issue 133
JUN - JUL 2016
Issue 132
APR - MAY 2016
Issue 131
FEB - MAR 2016
Issue 130
DEC 2015 - JAN 2016
Issue 129
OCT - NOV 2015
Issue 128
AUG - SEPT 2015
Issue 127
JUN - JUL 2015
Issue 125
APR - MAY 2015
Issue 125
FEB - MAR 2015
Issue 124
DEC 2014 - JAN 2015
Issue 123
OCT - NOV 2014
Issue 122
AUG - SEPT 2014
Issue 121
JUN - JUL 2014
Issue 120
APR - MAY 2014
Issue 119
FEB - MAR 2014
Issue 118
DEC 2013 - JAN 2014
Issue 117
OCT - NOV 2013
Issue 116
AUG - SEPT 2013
Comments (0)
Write a Comment